Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Products

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Overview Package Size 1.00cm * 1.00cm * 1.00cm Package Gross Weight 300.000kg Scaffolding one-stop Solution China Wuxi T

Send your inquiry

DESCRIPTION

Overview
Basic Info.
Model NO. model C
Framework Combined Scaffolding
Supporting Mode Suspended Scaffolding
Lapping Form Single Row Scaffolding
Erection Position External Scaffolding
Move Method Horizontal mobile Scaffolding
Scaffolding Part Type Scaffolding Couplers
Construction Properties Building Scaffold
Types Pressed, Forged
Manufacturability 500000PCS/Month
Materials Q235/Q355 Strength Steel
Size 34mm, 42mm, 48.3mm, 60mm
Surface Electro Galvanized, Hot DIP Galvanized, Powder COA
Standard En74/BS1139/JIS
Transport Package Pallet
Specification Multiple
Trademark Total Contec
Origin Wuxi, China
HS Code 73084000
Production Capacity 50000 Tons/Year
Packaging & Delivery
Package Size 1.00cm * 1.00cm * 1.00cm Package Gross Weight 300.000kg
Product Description
Scaffolding one-stop Solution
China Wuxi Total Scaffolding Manufacturer. Wuxi factory and Tangshan FactoryMain products: Ringlock, Cuplock, Octagonlock, Kwikstage, Frame, Haki, Aluminum tower, Shoring prop, Couplers.
Instrument and equipment

Item Code: FDC1 Item Code: FSC2Item Code: FGC3Item Code: SGC4Item Code: FSSC5
forged double couplerforged swivel couplerfixed girder couplerswivel girder couplerforged side by side coupler
Size: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3*42mm
Weight: 1.05kgWeight: 1.15kgWeight: 1.65kgWeight: 1.65kgWeight: 0.75kg
Item Code: USFDC1 Item Code: USFSC2Item Code: FPC3Item Code: FBRC4Item Code: FIJP5
US forged double couplerUS forged swivel couplerforged putlog couplerboard retaining couplerforged inner joint pin
Size: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mm
Weight: 1.65kgWeight: 1.5kgWeight: 0.65kgWeight: 0.61kgWeight: 1.15kg
Item Code: FGDC1 Item Code: FGSC2Item Code: 60FC3Item Code: 60FSC4Item Code: 89FC5
Germany double couplerGermany swivel couplerforged fixed couplerforged swivel couplerforged fixed coupler
Size: 48.3mmSize: 48.3mmSize: 48.3*60mmSize: 48.3*60mmSize: 48.3*89mm
Weight: 1.25kgWeight: 1.45kgWeight: 1.35kgWeight: 1.45kgWeight: 2.59kg
Item Code: UKPDC1 Item Code: UKPSC2Item Code: PSC3Item Code: PIJP4Item Code: 89FSC5
UK Pressed Double CouplerUK Pressed swivel CouplerPressed Sleeve CouplerPressed inner Joint Pinforged swivel coupler
Size: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3*89mm
Weight: 0.85kgWeight: 1.01kgWeight: 1.01kgWeight: 0.82kgWeight: 2.71kg
Item Code: JISPDC1 Item Code: JISPSC2Item Code: PPC3Item Code: PFC4Item Code: FHC5
JIS Pressed Double CouplerJIS Pressed swivel CouplerPressed putlog couplerPressed Fencing Couplerforged half coupler
Size: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mm
Weight: 0.68kgWeight: 0.68kgWeight: 0.65kgWeight: 0.5kgWeight: 0.55kg
Item Code: PMC1Item Code:PLC2Item Code: PBF3Item Code:SCBC4Item Code: UHC5
Pressed mushroom couplerPressed ladder CouplerPressed Brazil fixed couplerPress Brazil swivel CouplerU head coupler
Size: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mmSize: 48.3mm
Weight: 0.25kgWeight: 0.65kgWeight: 1.21kgWeight: 1.25kgWeight: 1.2kg

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler



Provides a 90°Degree fixing of Vertical and Horizontal Tubes. This is a load bearing fitting complying toBS 1139 1991, EN74 A.

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Packaging & ShippingCertifications1. Q: What is your product range? A: Ringlock, Cuplock, Frame, Couplers, aluminum scaffolding tower, scaffolding accessories.
Q: What is MOQ? A: Usually we don't have a MOQ, but it depends on the product you are looking for.
2. Q: What kind of payment term do we accept? A: West Union, T/T and L/C.
Q: Can I get samples? Yes, we offer free samples on most itmes if it is not too heavy or big. freight collect
Q: How is your factory's production capacity? A: Over 500 tons per month.
3. Q; Where have you been exported? We have exported to Asia, South Ametica, Europe, Africa and Middle east.
Q: What kind of international certificate do we offer? A: CE certificate and SGS test report.
Q: How can you assure the welding quality? A: We have made the flaw detection test which can prove the good welding quality.
4. Q: What is production time? Usually it takes 25-30 days for the first container,production goes faster after the first container once
all raw materials are ready.The more the faster. Partial shipment can be arranged if requested.
5. Q: How does your factory control quality?
A: Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional
steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from
raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.
6. Q: How is the bearing capacity of your scaffolding?
A: It depends on which kind of scaffolding, scaffolding sizes, and the setup plan. We have many test reports for your reference.
7. Q: How High can your scaffolding reach to?
A: Normally, we suggest our client to setuo the scaffolding maximum reach to 30 meters. But some of our customers setup our
scaffolding reach to 50 meters. According to safety documents, every 20 meters, we need to make a steel platform where the
scaffolding can be setup continually.
8. Q: What is your after-sale service? A: All the after-sale problems will be solved based on mutual friendly communication.
In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at your
warehouse. In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed
certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss
will be compensated as the new goods sent to your side in next order.