Steel Scaffolding Steel Plank Board

Products

Steel Scaffolding Steel Plank Board

Steel Scaffolding Steel Plank Board

Overview (2) Stamping holes are on the scaffolding plank to resist skidding for workers.(3) The galvanized surface makes

Send your inquiry

DESCRIPTION

  • Overview
  • Product Parameters
  • Production Flow
  • Packaging & Shipping
  • Application
  • Company Profile
  • FAQ
Overview
Basic Info.
Model NO. Scaffolding Steel Plank
Type Fixed
Structural Style Multi-Pole Scaffolding
Framework Combined Scaffolding
Supporting Mode Projecting Scaffolding
Lapping Form Full Scaffolding
Erection Position External and Internal Scaffolding
Scaffolding Part Type Scaffolding Planks
Construction Properties Building Scaffold
Surface Pre-Galvanized, Hot DIP Galvanized
Steel Grade Q195, Q235
Support Type Common Support, Ladder Support, Box Support
Hook with or Withou Hook
Height 38mm, 40mm, 45mm, 50mm, 63mm
Thickness 1.0mm, 1.1mm, 1.2mm, 1.5mm, 1.8mm, 2.0mm
Length 0.5-4.0m
Standard BS1139
MOQ 500PCS
Transport Package Packed by Steel Strip or in Bulk
Specification 200/210/225/230/240/250/300/420/480/500mm
Trademark WUFANG
Origin China
HS Code 73084000
Production Capacity 100 Tons/Day
Product Description
(2) Stamping holes are on the scaffolding plank to resist skidding for workers.(3) The galvanized surface makes scaffolding plank more stronger in moist environment.(4) Various size of scaffolding plank could be customized.Advantages of Steel Scaffolding Plank Board (1) Strong bearing capacity. (2) Duabale & stable. (3) Easy to assemble & dismantle. (4) Corrode-resistant, slip prevention, anti-fire, less weight. (5) Excellent security function. (6) Long durability, the working life can up to 5-8 years.

Tangshan Wufang Industry Co., Ltd, with an investment of U.S. Dollars of 8 million, is a professional manufacturer engaged in the design, production & sale of scaffolding systems.

1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.2. Team: We have professional team for sale, project design and construction.3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, etc.4. Production capacity: 7000-10000 Tons/month.5. Loading capacity: 8-12 containers/day.6. Delivery time: 10-15 days for 3-5 containers.Fast delivery to satisfy your urgent project demand.

Q1: Are you a factory or trading company? A: We are a factory specializing in manufacturing scaffolding material.Q2: Where is the loading port?A: Tianjin(Xingang) Port.Q3: What's the MOQ of the product?A: Different item has different MOQ. Normally one Container is preferred.Q4: What certificates do you have?A: We have ISO 9001, SGS certification.Q5: Can I get some samples? A: Yes, but usually the customer will pay for the cost and freight charges. Q6: Do you have an OEM service?A: Yes. We can provide OEM and ODM services as your requirements.Q7: How long is the production cycle after ordering?A: General it is about 15-30 days, according to different quantity requirement.

Product Parameters

(1) Scaffolding plank is the main part of scaffolding system which is convenient for worker to walk on high building.
Pre-galvanized Scaffolding Steel Plank Metal Deck Walking Board

Width*Height Thickness Length
200 x 40mm 1.0-2.0mm 0.5-4.0M
210 x 45mm
225 x 38mm
230 x 63mm
240 x 45mm
250 x 40mm
250 x 50mm
300 x 50mm
400 x 40mm
420 x 45mm
480 x 45mm
500 x 50mm

Production Flow

Packaging & Shipping

Application

Company Profile

FAQ

Related Products