Q235 Hot DIP Galvanized Steel Scaffold Pipe En39 Scaffolding Steel Tube for Building

Products

Q235 Hot DIP Galvanized Steel Scaffold Pipe En39 Scaffolding Steel Tube for Building

Q235 Hot DIP Galvanized Steel Scaffold Pipe En39 Scaffolding Steel Tube for Building

Scaffolding Tube, Scaffolding Pipe, Steel Pipe, Steel Tube, it is the basic steel material with different BS, EN, ASTM,

Send your inquiry

DESCRIPTION

Basic Info.
Supporting Mode Floor Type Scaffolding
Lapping Form Full Scaffolding
Erection Position External Scaffolding
Move Method Attached Lifting Scaffolding
Scaffolding Part Type Scaffolding Frames
Construction Properties Building Scaffold
MOQ 1 Piece
Usage Building/Projects/Oil Gas/Construction
Technique ERW
Steel Q195/Q235/Q355
Testing Report SGS
Surface Treatment Hot DIP Galvanized/Pre-Galvanized/Painted
Transport Package Steel Strapped
Specification 33/38/42/48/60/72
Trademark HUAYOU
Origin China
HS Code 7306309000
Production Capacity 100000 Tons/Year
Product Description
Scaffolding Tube, Scaffolding Pipe, Steel Pipe, Steel Tube, it is the basic steel material with different BS, EN, ASTM, JIS standard, the pipe is normally combined together with scaffold coupler, or as the basic material to produce ringlock, frame, cuplock, k-stage etc different systems. Any requirement, pls contact us.
MaterialsQ195; Q235; Q355; A53-A369; #10--#45 steel
Tolerance+/-3%
Surface TreatmentOiled/Black/Painted/Galvanized
Processing ServiceBending/Punching/Cutting
Testing ReportSGS
PackageSteel Strap/anti-water roof
Engrave markingAs request
Production Capacity10000 tons/Month
Delivery time7-20 days

SPECIFICATION:
ODWALL THICKNESS LENGTHCUSTOMIZED
21mm(1/2'')0.6mm--2.2mm0m--6mYes
26mm(3/4'')0.6mm--2.2mm0m--6mYes
33.4mm(1'')0.6mm--2.2mm0m--6mYes
34mm1.4mm--4.0mm0m--6mYes
38mm1.4mm--4.0mm0m--6mYes
42.2mm(1-1/4'')0.6mm--2.2mm0m--6mYes
42mm1.4mm--4.0mm0m--6mYes
48.3mm(1-1/2'')1.8mm-4.0mm0m--6mYes
48.6mm(1-1/2'')1.8mm--2.4mm0m--6mYes
60.3mm(2'')1.8mm-4.0mm0m--6mYes
88.9mm(3'')2.0mm-5.5mm0m--6mYes
114.3mm(4'')2.0mm--10.0mm6m--12mYes
141.3mm(5'')2.5mm--10.0mm6m--12mYes
165mm(6'')2.5mm--10.0mm6m--12mYes
219.1mm(8'')2.5mm--10.0mm6m--12mYes

QAULITY CONTROL:
We have strict inspection procedure for steel pipe. From the raw materials, welding, size, surface treatment and packages, our QC team will follow every step and assure qualified products to customers.
PACKAGE AND LOADING:
All tube packed by bundle, normal 61pcs/bundle or with PP-cloth to pack as request. Within 5.9m can load by 20ft, 6m or longer will be in 40ft.
CERTIFICATE:
According to customers' requirements, we will arrange all our order materials to making SGS test. As a professional scaffolding steel pipe supplier, we guarantee all our products and give you more honest support. Quality is No.1 place forever.
COMPANY PROFILE:
Tianjin Huayou Scaffolding Co., Ltd is located in Tianjin City, which is the largest manufacturing base of steel and scaffolding products. Furthermore, it is the north biggest port city that easier to transport cargo to all over the world.
We specialize in the production and sales of various scaffolding products, such as Ringlock system, steel Board, Frame system, Jack base, Pipes and fittings, Couplers, Cuplock system, Kwickstage system, Aluminuim system and other scaffolding or formwork accessories. With the effort of over 10 years experience team, Huayou products has been exported to different countries and clients cover different areas like South East Asia market, Middle East Market, Europe, America, Austrilia etc.
Our principle: "Quality First, Customer Foremost and Service Ultmost." We devote ourselves to meet your requirements and promote our mutually beneficial cooperation.
Warmly welcome your inquiry support.
RELATED PRODUCT:
FAQ:
Q1: Where is the loading port?
A: Tianjin Xin portQ2: What's the MOQ of the product?
A: Different item has different MOQ, can be negotiated.Q3: What certificates do you have?
A: We have ISO 9001, SGS etc.Q4: Can I get some samples? A: Yes, Sample is free, but shipping cost is on your side. Q5: How long is the production cycle after ordering?
A: Generally need around 20-30 days.Q6: What is the payment methods?
A: T/T or 100% irrevocable LC at sight, can be negotiated.