Galvanized Puntales Metalicos Formwork Construction Adjustable Painted Scaffolding Shoring Metal Acrow Steel Prop

Products

Galvanized Puntales Metalicos Formwork Construction Adjustable Painted Scaffolding Shoring Metal Acrow Steel Prop

Galvanized Puntales Metalicos Formwork Construction Adjustable Painted Scaffolding Shoring Metal Acrow Steel Prop

Overview Product Description Adjustable scaffold acrow painted building halloween shoring Jack scaffolding steel prop(1)

Send your inquiry

DESCRIPTION

Overview
Basic Info.
Model NO. steel prop
Hscode 7308400000
Usage Building, Industrial
Material Grade Q195/Q235/Q345
Color as Your Required
Prop Type Cup Nut, Cast Nut
Surface Treatment Painted, Powder Coated, Electro Galvanized or HDG
Adjustable Length 600-6000mm
Transport Package Bundle or Bulk
Specification 48/56/60/76/89mm
Trademark ZHIYI(20 years Manufacturing experience)
Origin Tianjin, China
HS Code 7308400000
Production Capacity 50000 Pieces Per Years
Product Description

Product Description

Adjustable scaffold acrow painted building halloween shoring Jack scaffolding steel prop(1)Steel prop is mainly made of bottom plate, outer tube, inner tube, swivel nut,cotter pin, upper plate and the accessories scaffolding tripod, head jack, the structure is simple and flexible.(2)The structure of steel prop is simple, so it is easy to assemble and disassemble.(3)Steel prop is adjustable because the inner tube can extend and shrink in the outer tube, so it can be adjusted according to the required height.(4) The steel prop can be reused. Even though it is out of work, the material can also be recycled.(5)Steel prop can be adjusted according to the different height of the cnstructions.steel prop ,scaffolding steel props, steel props for construction,adjustable steel props, steel shoring prop scalfolding,ajustable steel prop,steel shoring prop scalfolding,formwork steel prop.

SpecificationSteel Prop
Outer Diameter48mm--60mm; 40mm--48mm;
Pipe Thickness1.5mm--3mm
Length600mm--5000mm
StandardGB, ANSI, ASME, ASTM, JIS, DIN, BS, EN
MaterialQ195,Q235, Q345
PackageIn pallets or in bundle or in bulk
Typeheavy duty or light duty
Applicationslab or formwork supporting
Surface Treatmentpainted,powder coated, electro galvanized or hot dip galvanized

Packaging & Shipping

To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.

Installation Instructions


Production Process

Company Profile


Tianjin Zhiyi Metal Products Co. Ltd was founded in 2002, which holds ten million RMB registered capital. Our company is located in Tianjin, a port city in northern China, and its covers an area of 27000 square meter. Our company was specialized in the design and manufacture of metal products. The products of our factory have always been wildly recognized by both abroad and domestic customers in the past ten years. In the year 2008, our company was officially designated as the main supplier of assistant project by Tianjin government. And our products that were exported to west Asia and South American was wildly popular among our customers.The main metal products produced by our company include steel props, scaffolding, steel plank , LvL plank , plywood,Base jack, scaffolding coupler, formwork accessories, galvanized pipe ,H20 beam,ground screw, solar stand, C / Z /H section steel , other building material etc.Our company has professional managerial personnel and well-qualified technical team. From the very start of our company, we always insist on the concept of "Innovation, quality, service, economy, dedication, and apparition." Believing products quality can be our vitality, time will prove our reputation and reasonable price is our competitiveness, our company stands tall in the economic capital of north China.

Certifications


FAQ

How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
How to pay?
TT and L/C are acceptable and TT will be more appreciated.
What is the delivery time?
It depends on order quantity.
Generally, the delivery time will be within 15 to 30 days.
How about our product quality?
Our steel prop piles are manufactured with first quality materials
What is steel quality?
This system is built from Q235 steel conical pipe with welded blades,
and can be applied in a wide variety of different geological locations.
How to order from Zhiyi ?
Buyer Send Enquiry →Get Zhiyi Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit